Don't leave anything to chance with your roofing project. This comprehensive, step-by-step checklist guides you through every phase — from initial inspection to final walkthrough — ensuring you make informed decisions and get quality results.
Find Verified ContractorsBe cautious of contractors who exhibit any of these warning signs:
Before contacting contractors, perform your own preliminary assessment to understand the scope of work needed.
Finding the right contractor is the most important step. Take time to research thoroughly rather than rushing into a decision.
Getting multiple detailed quotes helps you understand fair pricing and evaluate each contractor's approach to your project.
A thorough contract protects both you and the contractor. Never begin work without a signed, detailed contract.
Proper preparation minimizes disruption and helps the project proceed smoothly.
A thorough final inspection ensures the work meets your expectations and protects your warranty coverage.
We recommend getting at least three written quotes from different licensed contractors. This gives you a reasonable range of pricing and approaches. Be wary of quotes significantly below the average — this often indicates corners being cut on materials, labor, or insurance. Comparing three or more quotes also helps you understand the scope of your project and evaluate each contractor's professionalism.
A comprehensive roofing contract should include: full company name, address, license number, and insurance details; detailed scope of work including materials (brand, model, color); project timeline with start and completion dates; total cost with payment schedule (never more than 10-30% upfront); warranty terms for both materials and workmanship; debris removal and cleanup responsibilities; permit responsibilities; and a cancellation clause. Never sign a contract that's vague about materials or scope.
While you don't need to be home for the entire project, we recommend being present at the start to confirm scope and at completion for the final walkthrough. During the project, contractors should have access to electricity and water. Remove vehicles from the driveway and protect landscaping near the work area. If you have pets, keep them indoors during work hours as the noise and activity can be stressful.
Most residential roof replacements take 1-3 days for a standard single-family home with asphalt shingles. Larger homes, complex roof designs, or premium materials (tile, metal, slate) may take 5-7 days or longer. Weather delays can extend the timeline. Your contractor should provide a realistic timeline in the contract and communicate any delays promptly.